Doherty High School Gym Floor

Doherty High School

Doherty High School

Colorado Springs, CO

Product Used: RezillBase™ RP
Project Size: 17,600 square feet
Proudly Installed By: El Paso Floor (Colorado Springs, CO)

Project Description: Doherty High School had an existing floating floor system installed over an old synthetic urethane floor. In October of 2018, a water main break flooded the gym and other areas, destroying the maple floor. Additionally, the synthetic flooring was found to contain mercury, which required removal and abatement, and the school of over 2,000 students was without their main gym for 13 months. Ultimately, the entire gym was remodeled with new bleachers, a climbing wall, updated paint and wall graphics, and El Paso Floor installed the new Connor RezillBase RP system with a beautiful paint, stain and graphics package.

Product used in this project

  • RezillBase_1stGrade_Heidelberg
    REZILLBASE™
    Match Competitive Bids
    Static Loading Capable
    Fixed Resilient System

Next Story

At The Grounds Event Center

Read Now